The list that becomes
the homeowner's first record.
Every new home starts with a walkthrough and a punch list. Most of those punch lists end up as a PDF in an email that gets lost six weeks later. The good ones become the first verified entry in the home's permanent record — and travel with the property at every future sale.
Punch list · 1842 Ridgeway Dr
Substantial completion · Apr 11
All items resolved
100% · 18 days
-
Kitchen
Cabinet door align · N wall
Cabinetry · Granger
-
Master Bath
Grout match · shower wall
Tile · ProTile
-
Living
Hardwood seam · hearth
Floors · Atlas
-
Exterior
Downspout angle · NE
Site · Brewer
-
Garage
Door balance adjust
Doors · OverheadCo
Transferred at closing
Apr 29 · fingerprintedA new home is delivered with a stack of paper. Five years later, the homeowner can find none of it.
Substantial completion, the punch-list walkthrough, the certificate of occupancy, the warranty packets, the appliance manuals, the manufacturer registration cards — it all arrives in a few weeks at the end of construction and then scatters across email, drawers, and lost USB sticks. When the homeowner needs the punch-list record three years later for a warranty claim, or seven years later when selling, it is gone.
76%
of new construction buyers report missing builder documents within 3 years
NAHB homeowner survey
$2,400
average out-of-pocket cost when a warranty claim fails due to missing punch-list evidence
Industry analysis
47
average open items at substantial completion on a typical single-family build
AGC walkthrough data
How the punch-list handoff actually works.
- 01
Capture at walkthrough
Each item is logged with room, severity, photo, and the builder's assigned trade. Fingerprinted at upload via Digital Evidence.
- 02
Track to resolution
The builder updates status as items close. Photos and trade signoffs attach to the item. Nothing is lost in email.
- 03
Verify at final walkthrough
Cleared items are marked complete. Outstanding items roll into the builder's warranty obligation with documentation intact.
- 04
Transfer at closing
The full cleared punch list — every photo, every trade signoff, every date — becomes Entry #1 in the homeowner's permanent property record.
What stays in the record
Punch-list items, all resolved, all photographed, all signed off by trade, all fingerprinted via Digital Evidence.
This is the first entry in the homeowner's permanent property record. Everything else builds on it.
Cleared items · sample
All verified-
Kitchen
Resolved · Apr 14
Cabinet door alignment, north wall
Cabinetry · Granger Inc.
3 photos
-
Master Bath
Resolved · Apr 16
Grout color match, shower wall
Tile · ProTile Solutions
2 photos, invoice
-
Living
Resolved · Apr 18
Hardwood plank seam, near hearth
Flooring · Atlas Hardwoods
4 photos
-
Exterior
Resolved · Apr 22
Downspout discharge angle, NE corner
Site · Brewer Excavating
2 photos, grading verified
-
Garage
Resolved · Apr 28
Door balance adjustment
Doors · OverheadCo
Service ticket
Most builders hand you a house.
We're handing homeowners the proof.
The Terraces is a 60-unit Blue Ridge community where every Guidebook — including the cleared punch list at handoff — transfers to the new owner at closing. The buyer receives the home and the record together.
In their words
Ed Oravetz
Builder · Terraces Townhomes, Blue Ridge GA
Who builds with the punch-list handoff
-
Builders
Differentiate at the close. Hand the homeowner a verified record instead of a USB stick.
-
New-construction buyers
Inherit a cleared record from day one. Refer back when warranty issues arise.
-
Listing agents
When that same home sells in seven years, the punch-list record is still there. Pull it for the listing.
Start the record at the punch list.
Free for up to 10 properties. Builders with portfolios — talk to us about volume handoff workflows.